One of 2 filings for this project. The project's main page, with every filing and where each stands: Building Stone (Granite Khanda / Gitti / Boulder / Pahadi Lal Morrum) Mining Project
Project details
| Status | Under environmental review |
|---|---|
| Status since | 21 Sept 2026 |
| Application filed | 4 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dev Prakash Maurya |
| Land area | 5 acres (2 ha) |
| Project cost | ₹1.6 crore |
| Village / locality | Gonda |
| Taluk / tehsil | Karwi |
| District | Chitrakoot |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04581 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Sept 2026 (this page) | Under environmental review | 5 acres | ₹1.6 crore |
| Early planning filed 23 May 2024 | Cleared for impact study | 5 acres | ₹1.6 crore |
In context
116 applications in Chitrakoot since January 2022 are in the same category (Mining): 89 approved, 23 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5 acres, this one is smaller than 85% of them.
7 other mining leases have applied within 500 m of this site; together with this one they cover 42.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 36 mining leases have applied within 5 km.
Where it is
Gonda, Karwi, Chitrakoot, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to UPEIDA Plans a 15-Kilometre Chitrakoot Link Expressway in Uttar Pradesh (5.8 km away).
Other projects nearby
- Building Stone (Granite Khanda / Gitti / Boulder / Pahadi Lal Morrum) Mining… — cleared for impact study, 0 m away
- "Granite Gitti, Khanda / Boulders" Project at Gata No./ Khand No.- 715 / 09,… — environmental approval granted, 100 m away
- "Granite Gitti, Khanda / Boulders" Project at Gata No./ Khand No.- 715 / 09,… — cleared for impact study, 100 m away
- Building stone (Granite Khanda, Gitty, Boulder, Red Morrum) Sandstone Mining… — cleared for impact study, 200 m away
- Building Stone (Granite), Gitti, Khanda, Boulder, Pahadi Lal Morrum Mining… — under environmental review, 250 m away
- Building Stone (Granite), Gitti, Khanda, Boulder, Pahadi Lal Morrum Mining… — cleared for impact study, 250 m away
- Building stone (Khanda, Gitty, Boulder, Red Morrum) Mining Project in Gata… — environmental approval granted, 300 m away
- Building stone (Khanda, Gitty, Boulder, Red Morrum) Mining Project in Gata… — cleared for impact study, 300 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.