Project details
| Status | Under environmental review |
|---|---|
| Status since | 23 Oct 2026 |
| Application filed | 30 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Raghav Chandak |
| Land area | 56.8 acres (23 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Dhaurahra Bangar |
| Taluk / tehsil | Karwi |
| District | Chitrakoot |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04688 |
In context
116 applications in Chitrakoot since January 2022 are in the same category (Mining): 89 approved, 23 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 56.8 acres, this one is larger than 66% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 227.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 12 mining leases have applied within 5 km.
Where it is
Dhaurahra Bangar, Karwi, Chitrakoot, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tirghumai Gangu Sand/Morrum Mining Project at Riverbed of River Yamuna. — environmental approval granted, 0 m away
- Tirghumai Gangu Sand/Morrum Mining Project at Riverbed of River Yamuna. — cleared for impact study, 0 m away
- Sand/Morum Mining at Yamuna Riverbed — under environmental review, 300 m away
- Terms of reference for environment clearance of proposed "Sand/Morrum Mining"… — environmental approval granted, 300 m away
- Terms of reference for environment clearance of proposed "Sand/Morrum Mining"… — cleared for impact study, 300 m away
- Riverbed sand/morrum mining having lease area-23.0 ha along River Yamuna in… — environmental approval granted, 550 m away
- Riverbed sand/morrum mining having lease area-23.0 ha along River Yamuna in… — cleared for impact study, 550 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — under environmental review, 800 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.