Project details
| Status | Under environmental review |
|---|---|
| Status since | 30 Jul 2026 |
| Application filed | 13 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Uttar Pradesh Expressways Industrial Development Authority (Upeida) |
| Land area | 269.5 acres (109.1 ha) |
| Project cost | ₹288.4 crore |
| Village / locality | Arangabad Mafi |
| Taluk / tehsil | Budaun |
| District | Budaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04739 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Arangabad Mafi, Budaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest for Non-Forest Purpose for Laying of Gas Pipe Line along… — more information requested, 3.6 km away
- Proposed Protected Forest Land to be Re-diverted for Laying of Gas Pipe Line… — forest land use approved, 7.6 km away
- Diversion of protected forest land for Construction of approach road to the… — lapsed, 8.1 km away
- Amended BharatNet Project (Jagat-Budaun) — lapsed, 8.6 km away
- BPCL Retail Outlet on Badaun-Dataganj Road (SH-126) , In KM Stone No. 4 (Ch.… — forest land use approved, 9.9 km away
- Forest Land proposed to be diverted for construction of approach access to… — lapsed, 10.3 km away
- Protected Forest Land proposed to be diverted for the Widening of… — more information requested, 10.6 km away
- Diversion of 0.8868 Ha. forest land for Jio Digital Fibre Private Limited… — lapsed, 12.2 km away
More from Uttar Pradesh Expressways Industrial Development Authority (Upeida) in Budaun
- Proposed Forest Land to be diverted for Construction of Half-Diamond Interchange — forest land use approved
All 39 Uttar Pradesh Expressways Industrial Development Authority (Upeida) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.