Project details
| Official title | Proposed Protected Forest Land to be Re-diverted for Laying of Gas Pipe Line along Mathura-Budaun-Bareilly National Higway (NH-530B) From Design Ch. 166.236 Km to Design Ch. 167.236 Km LHS, From Design Ch. 167.236 Km to Design Ch. 182.436 Km LHS, From Design Ch. 182.436 Km to Design Ch.185.036 Km & Design Ch. 186.936 Km to Design Ch.187.236 LHS, From Design Ch. 187.236 Km to Design Ch. 190.586 Km and From Design Ch. 192.640 Km to Design Ch.197.616 RHS Km for Approx 27.426 Km in District-Buda |
|---|---|
| Status | Forest land use approved |
| Status since | 20 May 2026 |
| Application filed | 8 Apr 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 3.7 acres (1.5 ha) |
| Forest land | 2.5 acres (1 ha) |
| Project cost | ₹12 crore |
| Village / locality | Arifpur Nawada |
| Taluk / tehsil | Budaun |
| District | Budaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06247 |
In context
8 applications in Budaun since January 2022 are in the same category (Roads & highways): 3 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Arifpur Nawada, Budaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- BPCL Retail Outlet on Badaun-Dataganj Road (SH-126) , In KM Stone No. 4 (Ch.… — forest land use approved, 3.7 km away
- Forest Land proposed to be diverted for construction of approach access to… — lapsed, 3.7 km away
- Protected Forest for Non-Forest Purpose for Laying of Gas Pipe Line along… — more information requested, 4.2 km away
- Diversion of 0.8868 Ha. forest land for Jio Digital Fibre Private Limited… — lapsed, 4.9 km away
- Amended BharatNet Project (Jagat-Budaun) — lapsed, 6.7 km away
- Proposed Integrated Manufacturing & Logistic Cluster (IMLC) - Badaun at… — under environmental review, 7.6 km away
- "Ordinary Soil Mining" Project at Gata No.- 720, 722, 844, 848, Village-Palia… — environmental approval granted, 10 km away
- Re-diversion of forest land for laying of Optical Fiber Cable (OFC) by Jio… — lapsed, 12 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Budaun
- Protected Forest for Non-Forest Purpose for Laying of Gas Pipe Line along… — more information requested
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved
- Seeking Permission to Use 0.0333 Hectare Protected Forest Land for… — forest land use approved
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — forest land use approved
5 Hindustan Petroleum Corporation (HPCL) projects in Budaun
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.