Under environmental reviewMining · Auraiya, Uttar Pradesh

proposed "Ordinary Sand Mine (Category 1) Project" at Gata No. 104 Mi, Khand- 04, Mining Lease Area 10.3967 Ha, Village – Bijhalpur Ehtmali, Tehsil – Ajeetmal, District – Auraiya, Uttar Pradesh.Prop. Shri Vivek Kumar Tripathi S/O Shri Har Narayan Tripathi,Area 10.3967 Ha.

proposed "Ordinary Sand Mine (Category 1) Project" at Gata No. 104 Mi, Khand- 04, Mining Lease Area 10.3967 Ha, Village – Bijhalpur Ehtmali, Tehsil – Ajeetmal, District – Auraiya, Uttar Pradesh.Prop. Shri Vivek Kumar Tripathi S/O Shri Har Narayan Tripathi,Area 10.3967 Ha is a proposed mining project in Khera Danda, Auraiya, Uttar Pradesh. The site covers 25.7 acres. Its stated project cost is ₹85 lakh. As of 27 Nov 2026, its status is “Under environmental review” (since 18 Nov 2026).

See it on the live map All projects in Auraiya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: proposed "Ordinary Sand Mine (Category 1) Project" at Gata No. 104 Mi, Khand- 04, Mining…

Project details

StatusUnder environmental review
Status since18 Nov 2026
Application filed18 Sept 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantVivek Kumar Tripathi
Land area25.7 acres (10.4 ha)
Project cost₹85 lakh
Village / localityKhera Danda
Taluk / tehsilAuraiya
DistrictAuraiya
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04807

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 18 Sept 2026 (this page)Under environmental review25.7 acres₹85 lakh
Early planning filed 30 May 2025Cleared for impact study25.7 acres₹85 lakh

In context

26 applications in Auraiya since January 2022 are in the same category (Mining): 17 approved, 9 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 25.7 acres, this one is larger than 81% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 76.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.

Where it is

Khera Danda, Auraiya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Vivek Kumar Tripathi in Auraiya

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.