One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of "Ordinary Sand Mine (Category- 1)" Gata No.- 104 Mi (Khand- 05) over…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 18 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vivek Kumar Tripathi |
| Land area | 24.1 acres (9.8 ha) |
| Project cost | ₹85 lakh |
| Village / locality | Khera Danda |
| Taluk / tehsil | Auraiya |
| District | Auraiya |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04828 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Sept 2026 (this page) | Under environmental review | 24.1 acres | ₹85 lakh |
| Early planning filed 31 May 2025 | Cleared for impact study | 24.1 acres | ₹85 lakh |
In context
26 applications in Auraiya since January 2022 are in the same category (Mining): 17 approved, 9 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 24.1 acres, this one is larger than 73% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 49.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Khera Danda, Auraiya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of "Ordinary Sand Mine (Category- 1)" Gata No.- 104 Mi… — cleared for impact study, 0 m away
- proposed "Ordinary Sand Mine (Category 1) Project" at Gata No. 104 Mi, Khand-… — under environmental review, 250 m away
- proposed "Ordinary Sand Mine (Category 1) Project" at Gata No. 104 Mi, Khand-… — cleared for impact study, 250 m away
- Proposed Project of "Ordinary Sand Mine (Category- 1)" Gata No.- 104 Mi… — under environmental review, 650 m away
- Proposed Project of "Ordinary Sand Mine (Category- 1)" Gata No.- 104 Mi… — under environmental review, 650 m away
- Proposed riverbed ordinary sand (category-I) mining project from Yamuna River… — under environmental review, 1.1 km away
- Proposed Pachnad Major Irrigation Scheme — cleared for impact study, 5.1 km away
- Proposed Pachnad Major Irrigation Scheme — more information requested, 5.1 km away
More from Vivek Kumar Tripathi in Auraiya
- proposed "Ordinary Sand Mine (Category 1) Project" at Gata No. 104 Mi, Khand-… — under environmental review
- proposed "Ordinary Sand Mine (Category 1) Project" at Gata No. 104 Mi, Khand-… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.