What is Developing? Open the mapMap

Under environmental reviewMining · Hamirpur, Uttar Pradesh

"Sand/Morrum Mining" from Riverbed of Betwa River

"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Kupra, Sarila, Hamirpur, Uttar Pradesh. The site covers 18 acres. Its stated project cost is ₹1.2 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 29 Oct 2026).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Sand/Morrum Mining" from Riverbed of Betwa River?

"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Kupra, Sarila, Hamirpur, Uttar Pradesh. The site covers 18 acres.

Who is building it?

The applicant is Kuldeep Kumar Awasthi.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Kupra, Sarila, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.2 crore and a site of 18 acres.

When was it filed?

The application was filed on 20 Apr 2026.

Project details

Official title"Sand/Morrum Mining" from Riverbed of Betwa River at Village- Kupra, Khand No. 23/28, (Gata No.- 01/7, 02/11), lease area- 7.300 Ha., Tehsil- Hamirpur, Sarila, District- Hamirpur, Uttar Pradesh, Project Proponent- M/s Shri Bihari Ji Construction & Suppliers (Prop.- Shri Kuldeep Kumar Awasthi S/o Shri Ram Prakash Awasthi)
StatusUnder environmental review
Status since29 Oct 2026
Application filed20 Apr 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantKuldeep Kumar Awasthi
Land area18 acres (7.3 ha)
Project cost₹1.2 crore
Village / localityKupra
Taluk / tehsilSarila
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04890

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 18 acres, this one is smaller than 99% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 130.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 20 mining leases have applied within 5 km.

Where it is

Kupra, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.