What is Township and Area Development Project Sapthnath Eco CIty'?
Township and Area Development Project Sapthnath Eco CIty' is a proposed township project in Ahladpur, Bareilly, Uttar Pradesh. It plans 28,130 units on 1,456.7 acres.
Who is building it?
The applicant is Bareilly Devlopment Authority.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 25 Nov 2026), as of 27 Nov 2026.
Where is it?
In Ahladpur, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2,577 crore and a site of 1,456.7 acres.
When was it filed?
The application was filed on 12 Sept 2026.
Project details
| Official title | Township and Area Development Project Sapthnath Eco CIty' at village Aaspur Khoobchand, Adupura Jagir, Barkapur, Kalapur, Kumhra, Navadiya Kurmiyan, Ahladpur, Harhapur & Mohrania Distt. Bareilly, Uttar Pradesh |
|---|---|
| Status | Cleared for impact study |
| Status since | 25 Nov 2026 |
| Application filed | 12 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Bareilly Devlopment Authority |
| Use | Township |
| Units | 28,130 |
| Land area | 1,456.7 acres (589.5 ha) |
| Plot area | 25,98,624 m² (2,79,71,329 sq ft) |
| Project cost | ₹2,577 crore |
| Village / locality | Ahladpur |
| Taluk / tehsil | Bareilly |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04894 |
What the filings say
What is planned
The Bareilly Development Authority (BDA) proposes to develop the 'Sapthnath Eco City,' a large-scale township and area development project. According to the applicant's layout plan, the township will accommodate a projected population of 93,620 people. The development is designed to include a mix of residential, commercial, and institutional zones.
The residential components are planned to include row housing, group housing, and dedicated pockets for Economically Weaker Sections (EWS) and Low Income Groups (LIG). The layout also identifies several sectors, ranging from Sector-01 to Sector-11, which will house various community and public facilities.
Layout and design
The township layout incorporates a wide range of public and semi-public facilities. The proposed educational infrastructure includes 17 nursery schools, nine primary schools, and an inter-college. Healthcare facilities planned for the site include a hospital, a dispensary, and nursing homes with a capacity of up to 30 beds.
For community use, the applicant has proposed six community centres, three marriage halls, and a club house. Other public utilities marked in the layout include:
- A police post and a post office
- A fire station
- A bus stand
- A solid waste collection centre
- A 33 KVA electric sub-station
- A sewage treatment plant (STP)
The area statement for the planning zone specifies the following land use distribution:
- Residential: 13,38,114.01 square metres
- Commercial: 66,875.87 square metres
- Public and Semi-Public Facilities: 61,174.01 square metres
- Parks and Open Spaces: 3,50,841.22 square metres
- Roads: 6,89,533.36 square metres
- Green Belt: 92,286.00 square metres
Land and surroundings
The project site covers 589.51 hectares (1,456.71 acres) across nine villages in the Bareilly district: Aaspur Khoobchand, Adupura Jagir, Barkapur, Kalapur, Kumhra, Navadiya Kurmiyan, Ahladpur, Harhapur, and Mohrania. Land acquisition documents indicate that the Bareilly Development Authority is purchasing land parcels directly from private owners using its own funds. The purchase rates for these parcels are determined by a committee, often set at four times the district circle rate.
Environmental safeguards
The applicant has established a schedule for monitoring baseline environmental data, which was planned to take place from March 1, 2026, to May 31, 2026. The monitoring program includes five locations for ambient air quality and noise levels, two locations for surface water, and three locations each for ground water and soil quality. The core zone monitoring station is located at coordinates 28°25'31.12"N and 79°29'57.74"E. During the monitoring period, the wind pattern was noted to be blowing from the North West.
| Item | Detail |
|---|---|
| Total Projected Population | 93,620 |
| Nursery Schools | 17 units |
| Primary Schools | 9 units |
| Community Centres | 6 units |
| Marriage Halls | 3 units |
| Electric Sub-station | 33 KVA |
| Monitoring Period | March – May 2026 |
Township and Area Development Project Sapthnath Eco CIty' site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
14 applications in Bareilly since January 2022 are in the same category (Buildings & townships): 8 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,456.7 acres, this one is larger than 93% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ahladpur, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Township and Area Development Project 'Pilibhit Bypass Avasiye Yojna' — withdrawn, 0 m away
- Proposed Protected Forest Land to be Diverted for Road Widening at… — more information requested, 2.8 km away
- Proposed EWS and LIG Housing Scheme — environmental approval granted, 5.7 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 6.1 km away
- Re-Diversion of Forest Land for Laying of Reliance Jio Optical Fibre Cable — more information requested, 6.2 km away
- Re-Diversion of Forest Land for Laying of Reliance Jio Optical Fibre Cable — lapsed, 6.4 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 6.4 km away
- Proposed Group Housing "Foresta" at Khasra No.239, 240, 241, 242, 279/1,… — environmental approval granted, 6.5 km away
More from Bareilly Devlopment Authority in Bareilly
- Township and Area Development Project 'Pilibhit Bypass Avasiye Yojna' — withdrawn
- Proposed EWS and LIG Housing Scheme — environmental approval granted
All 3 Bareilly Devlopment Authority projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.