Quick answers
What is Proposed EWS and LIG Housing Scheme?
Proposed EWS and LIG Housing Scheme is an approved residential project in Itawwa Beniram, Bareilly, Uttar Pradesh. It plans 960 units in 4 towers of up to 4 floors on 12.5 acres.
Who is building it?
The applicant is Bareilly Devlopment Authority.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Jul 2026), as of 27 Nov 2026.
Where is it?
In Itawwa Beniram, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹72 crore and a site of 12.5 acres.
When was it filed?
The application was filed on 9 May 2026.
Project details
| Official title | Proposed EWS and LIG Housing Scheme At Village- Itauwa Beniram, Tehsil- Bareilly, District- Bareilly, State- Uttar Pradesh |
|---|---|
| Status | Environmental approval granted |
| Status since | 25 Jul 2026 |
| Application filed | 9 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Bareilly Devlopment Authority |
| Use | Residential |
| Units | 960 |
| Towers | 4 |
| Floors (tallest) | 4 |
| Height | 13 m |
| Parking spaces | 1,068 |
| Land area | 12.5 acres (5.1 ha) |
| Built-up area | 45,746 m² (4,92,405 sq ft) |
| Plot area | 50,741 m² (5,46,171 sq ft) |
| Project cost | ₹72 crore |
| Village / locality | Itawwa Beniram |
| Taluk / tehsil | Bareilly |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04645 |
In context
14 applications in Bareilly since January 2022 are in the same category (Buildings & townships): 8 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 12.5 acres, this one is smaller than 57% of them.
Where it is
Itawwa Beniram, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be Diverted for Road Widening at… — more information requested, 5.1 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 5.1 km away
- Township and Area Development Project Sapthnath Eco CIty' — cleared for impact study, 5.7 km away
- Township and Area Development Project 'Pilibhit Bypass Avasiye Yojna' — withdrawn, 5.7 km away
- "Ordinary Earth Excavation/Mining Project" at Gata No.-300, 302 — environmental approval granted, 6.3 km away
- Forest Land Proposed to be diverted for approach access to HPCL Retail Outlet… — forest land use approved, 6.7 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 7 km away
- Proposed Protected Forest Land to be diverted for Construction of Underpass — forest land use approved, 7 km away
More from Bareilly Devlopment Authority in Bareilly
- Township and Area Development Project Sapthnath Eco CIty' — cleared for impact study
- Township and Area Development Project 'Pilibhit Bypass Avasiye Yojna' — withdrawn
All 3 Bareilly Devlopment Authority projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.