Project details
| Status | More information requested |
|---|---|
| Status since | 30 Oct 2026 |
| Application filed | 23 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Santosh Sagar |
| Land area | 300 m² |
| Project cost | ₹2.8 crore |
| Village / locality | Moradabad |
| Taluk / tehsil | Moradabad |
| District | Moradabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04917 |
In context
19 applications in Moradabad since January 2022 are in the same category (Buildings & townships): 6 approved, 5 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.1 acres, this one is smaller than 95% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Moradabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sunil Kumar Singh S/O Sri. Prem Singh — lapsed, 250 m away
- Ravindra Pal Singh — lapsed, 950 m away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Commercial… — lapsed, 1 km away
- (1) Mr Deepak Agarwal S/O Late Shri Ashok Agarwal (2) Smt Deepali Agarwal W/O… — lapsed, 1.2 km away
- Proposed Township and area development Sahyadri Residential Scheme Pocket -A — under environmental review, 1.2 km away
- Proposed Forest Land to Be Diverted for Entry/Ext Approach to Commercial… — lapsed, 1.8 km away
- Proposed Forest Land to Be Diverted for Entry/Exit Approach to Property of… — lapsed, 2 km away
- Shikhar Saxena — lapsed, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.