Project details
| Official title | Proposed Township and area development Sahyadri Residential Scheme Pocket -A at Village – Sonakpur, Tehsil – Moradabad (Uttar Pradesh) |
|---|---|
| Status | Under environmental review |
| Status since | 20 Nov 2026 |
| Application filed | 18 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Moradabad Development Authority |
| Land area | 52.5 acres (21.2 ha) |
| Project cost | ₹16.9 crore |
| Village / locality | Bhogpur Mithoni |
| Taluk / tehsil | Moradabad |
| District | Moradabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04478 |
In context
19 applications in Moradabad since January 2022 are in the same category (Buildings & townships): 6 approved, 5 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 52.5 acres, this one is larger than 84% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhogpur Mithoni, Moradabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ravindra Pal Singh — lapsed, 1.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Commercial… — lapsed, 1.1 km away
- Smt. Santosh Sagar — more information requested, 1.2 km away
- Sunil Kumar Singh S/O Sri. Prem Singh — lapsed, 1.3 km away
- Proposed Forest Land to Be Diverted for Entry/Ext Approach to Commercial… — lapsed, 1.7 km away
- (1) Mr Deepak Agarwal S/O Late Shri Ashok Agarwal (2) Smt Deepali Agarwal W/O… — lapsed, 2.3 km away
- Proposed Forest Land to be diverted for Entry/Exit approach property of Tej… — forest land use approved, 2.7 km away
- Ganga Sanitary Store by partner Prasoon Agarwal S/o Late Suresh Kumar Agarwal — lapsed, 2.8 km away
More from Moradabad Development Authority in Moradabad
- Protected Forest Land to be diverted for Construction of Nala at… — initial checks
- Environmental Clearance of Proposed Township and area development Govindpuram… — under environmental review
- Proposed Forest Land to be diverted for Entry Road Elevation Work — lapsed
All 4 Moradabad Development Authority projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.