Quick answers
What is Ordinary Soil Mine?
Ordinary Soil Mine is a proposed mining project in Nagla Islam, Najibabad, Bijnor, Uttar Pradesh. The site covers 2.2 acres.
Who is building it?
The applicant is Pramod Kumar.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Nagla Islam, Najibabad, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹17 lakh and a site of 2.2 acres.
When was it filed?
The application was filed on 6 Aug 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 25 Nov 2026 |
| Application filed | 6 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pramod Kumar |
| Land area | 2.2 acres (0.9 ha) |
| Project cost | ₹17 lakh |
| Village / locality | Nagla Islam |
| Taluk / tehsil | Najibabad |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04949 |
In context
24 applications in Bijnor since January 2022 are in the same category (Mining): 15 approved, 9 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.2 acres, this one is smaller than 100% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Nagla Islam, Najibabad, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 1.6 km away
- "no Increase in Pollution Load Certificate" for Proposed Addition of… — initial checks, 9.1 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 11.9 km away
- Proposed Protected Forest Land to be diverted for Entry/Exit approach to M/s… — more information requested, 13.1 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed, 13.2 km away
- Proposed Forest Land For Laying Water Pipe Line Under Jal Jeevan Mission Phase — lapsed, 13.3 km away
- Ordinary Soil Mine — initial checks, 14.1 km away
- No Increase in Pollution Load Certificate for Proposed Addition of Alternative… — initial checks, 14.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.