Quick answers
What is Ordinary Soil Mine?
Ordinary Soil Mine is a proposed mining project in Khera, Najibabad, Bijnor, Uttar Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Ankush Kumar.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Khera, Najibabad, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹20 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 12 Oct 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 4 Nov 2026 |
| Application filed | 12 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ankush Kumar |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Khera |
| Taluk / tehsil | Najibabad |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04296 |
In context
24 applications in Bijnor since January 2022 are in the same category (Mining): 15 approved, 9 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.9 acres, this one is larger than 58% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Khera, Najibabad, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- No Increase in Pollution Load Certificate for Proposed Addition of Alternative… — initial checks, 4.6 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — lapsed, 6 km away
- Proposed Protected Forest Land to be diverted for Entry/Exit approach to M/s… — more information requested, 8.3 km away
- Mirpur Durg RBM Mining Project, Proponent Team Growth Private Limited, Prateek… — environmental approval granted, 8.7 km away
- RBM (Mixed Form) Mining Project at (Khoh River) — environmental approval granted, 9 km away
- "RBM (MIXED FORM) Mining Project" at Gata No. – 70Mi, (Total area 1.265 Ha.) — environmental approval granted, 9.5 km away
- Proposed Project of "RBM Mine (Mixed Form)" located at Gata No. 70 Mi, Total… — initial checks, 9.5 km away
- RBM (Mixed Form) Mining Project — environmental approval granted, 9.5 km away
More from Ankush Kumar in Bijnor
- Ordinary Soil Mine — initial checks
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.