What is Developing? Open the mapMap

Cleared for impact studyMining · Jalaun, Uttar Pradesh

Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River at Gata No- 2558, 2563, Khand No. 04, Area- 16.195 ha

Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River at Gata No- 2558, 2563, Khand No. 04, Area- 16.195 ha is a proposed mining project in Bandhauli, Orai, Jalaun, Uttar Pradesh. The site covers 40 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 9 May 2026).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River at Gata No- 2558, 2563, Khand No. 04, Area- 16.195 ha is a proposed mining project in Bandhauli, Orai, Jalaun, Uttar Pradesh. The site covers 40 acres.

Who is building it?

The applicant is Kishore Girdharilal Khubchandani.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 9 May 2026), as of 27 Nov 2026.

Where is it?

In Bandhauli, Orai, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹50 lakh and a site of 40 acres.

When was it filed?

The application was filed on 24 Feb 2026.

Project details

Official titleProposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River at Gata No- 2558, 2563, Khand No. 04, Area- 16.195 ha in Village- Bandholi, Tehsil- Orai, District- Jalaun, Uttar Pradesh of M/s Inderdeep Infra India Limited, Director- Shri Kishore Ji Khubchandani
StatusCleared for impact study
Status since9 May 2026
Application filed24 Feb 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantKishore Girdharilal Khubchandani
Land area40 acres (16.2 ha)
Project cost₹50 lakh
Village / localityBandhauli
Taluk / tehsilOrai
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04985

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 40 acres, this one is larger than 52% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 160.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.

Where it is

Bandhauli, Orai, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Kishore Girdharilal Khubchandani in Jalaun

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.