Quick answers
What is this project?
Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 2559, 2563 (Khand No.02), over an area of 20.242 Hectares is a lapsed mining project in Bandhauli, Orai, Jalaun, Uttar Pradesh. The site covers 50 acres.
Who is building it?
The applicant is Yash Yadav.
Has it been approved?
No. The application was lapsed on 27 Jul 2026, so it is no longer under consideration.
Where is it?
In Bandhauli, Orai, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh and a site of 50 acres.
When was it filed?
The application was filed on 15 Oct 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata…
Project details
| Official title | Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 2559, 2563 (Khand No.02), over an area of 20.242 Hectares situated in Village – Bandhauli, Tehsil- Orai, District- Jalaun, Uttar Pradesh.M/S Mahakal Construction Proponent- Shri Yash Yadav . |
|---|---|
| Status | Lapsed |
| Status since | 27 Jul 2026 |
| Application filed | 15 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Yash Yadav |
| Land area | 50 acres (20.2 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Bandhauli |
| Taluk / tehsil | Orai |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02947 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 15 Oct 2025 (this page) | Lapsed | 50 acres | ₹90 lakh |
| Early planning filed 5 Apr 2025 | Cleared for impact study | 50 acres | ₹90 lakh |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 50 acres, this one is larger than 69% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 150 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Bandhauli, Orai, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — cleared for impact study, 0 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 350 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 350 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — lapsed, 500 m away
- Sand/Morrum Mine — environmental approval granted, 700 m away
- Sand/Morrum Mine — cleared for impact study, 700 m away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — cleared for impact study, 750 m away
- "Sand/Morrum Mining at Betwa River Bed" at Gata No. 2558, 2563 (Khand -05) of… — environmental approval granted, 850 m away
More from Yash Yadav in Jalaun
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.