Quick answers
What is this project?
Proposed 190 bedded Military Hospital at Mathura, Mathura Cantt, Uttar Pradesh Pin- 281001 is a proposed building project in Muhal Bramad Chawani, Mathura, Uttar Pradesh. The site covers 4.6 acres.
Who is building it?
The applicant is Ministry of Defense.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Muhal Bramad Chawani, Mathura, Uttar Pradesh.
How big is it?
It has a stated cost of ₹141.1 crore and a site of 4.6 acres.
When was it filed?
The application was filed on 9 Feb 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 3 Nov 2026 |
| Application filed | 9 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Ministry of Defense |
| Land area | 4.6 acres (1.9 ha) |
| Project cost | ₹141.1 crore |
| Village / locality | Muhal Bramad Chawani |
| Taluk / tehsil | Mathura |
| District | Mathura |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05004 |
In context
21 applications in Mathura since January 2022 are in the same category (Buildings & townships): 6 approved, 11 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.6 acres, this one is larger than 52% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Muhal Bramad Chawani, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Laying of Gas Pipeline — forest land use approved, 2 km away
- Proposed Forest Land to be Diverted for Laying of Gas Pipeline — lapsed, 2 km away
- Widening of the Bareilly-Mathura Road (NH-530B) from Km. Chainage 257+600 to… — forest land use approved, 2.4 km away
- Re-DIVERSION OF 0.7392 HECTARE PROTECTED FOREST LAND PROPOSED TO BE DIVERTED… — forest land use approved, 2.8 km away
- Permission for Sanwariya Gas Ltd Under Torrent Gas Ltd. laying125mm MDPE Gas… — in-principle approval, conditions pending, 3.8 km away
- "Ordinary Soil Mining" Project at Gata No.- 157, 158, 162, 165, 185, Village-… — environmental approval granted, 4 km away
- New Entry Gate near Laxmi Nagar Crossing at Km. Chainage 83+600 of… — more information requested, 5.1 km away
- Diversion of protected forest land for Construction of approach road to the… — forest land use approved, 5.8 km away