Quick answers
What is this project?
Area- 5.5700 Ha Building Stone (Sandstone) Gitti-Boulder Mining Project at Gata no. 997 Mi Khand No. 15, Village- Sindhoura, Tehsil-Mirzapur, District- Mirzapur, Uttar Pradesh is a proposed mining project in Sindhaura, Mirzapur, Uttar Pradesh. The site covers 13.8 acres.
Who is building it?
The applicant is Meera Kumari.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Sindhaura, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹10.8 crore and a site of 13.8 acres.
When was it filed?
The application was filed on 15 Apr 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 30 Jul 2026 |
| Application filed | 15 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Meera Kumari |
| Land area | 13.8 acres (5.6 ha) |
| Project cost | ₹10.8 crore |
| Village / locality | Sindhaura |
| Taluk / tehsil | Mirzapur |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05005 |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 13.8 acres, this one is larger than 99% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 35.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 21 mining leases have applied within 5 km.
Where it is
Sindhaura, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone, Sandstone, Quartzite, Ballast & Gitti Mining project of Gata… — under environmental review, 400 m away
- Transfer of Environmental Clearance for Building Stone, Sandstone, Quartzite,… — returned to applicant, 400 m away
- Proposed building stone (Gitti, Boulder, Patiya) sandstone mine at Gata No.… — environmental approval granted, 550 m away
- Proposed building stone (Gitti, Boulder, Patiya) sandstone mine at Gata No.… — cleared for impact study, 550 m away
- "Building Stone (Sandstone)" Mine from Village- Sindhora, Gata No.- 997 Mi,… — lapsed, 600 m away
- "Building Stone (Sandstone)" Mine from Village- Sindhora, Gata No.- 997 Mi,… — cleared for impact study, 600 m away
- "Building Stone Sand Stone" Project at Gata No.- 997Mi , Village- Sindhora,… — cleared for impact study, 600 m away
- "Building Stone Sand Stone" Project at Gata No.- 997Mi , Village- Sindhora,… — environmental approval granted, 600 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.