What is Developing? Open the mapMap

LapsedPipelines · Hamirpur, Uttar Pradesh

Project for Laying of Carbon Steel Gas Pipe Line (300mm)

Project for Laying of Carbon Steel Gas Pipe Line (300mm) is a lapsed pipeline project in Bharuwa Sumerpur, Hamirpur, Uttar Pradesh. The site covers 1.4 acres. Its stated project cost is ₹86 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 5 Sept 2025).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Project for Laying of Carbon Steel Gas Pipe Line (300mm)?

Project for Laying of Carbon Steel Gas Pipe Line (300mm) is a lapsed pipeline project in Bharuwa Sumerpur, Hamirpur, Uttar Pradesh. The site covers 1.4 acres.

Who is building it?

The applicant is Indraprastha Gas Limited New Delhi.

Has it been approved?

No. The application was lapsed on 5 Sept 2025, so it is no longer under consideration.

Where is it?

In Bharuwa Sumerpur, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹86 lakh; a site of 1.4 acres and 1.4 acres (0.6 ha) of forest land.

When was it filed?

The application was filed on 27 Jul 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Project for Laying of Carbon Steel Gas Pipe Line (300mm)

Project details

Official titleProject for Laying of Carbon Steel Gas Pipe Line (300mm) along with road on Kanpur -Sagar Marg NH-86 (New NH-34) at From Km. 80.000 to Km. 91.250 (RHS), Total Km. 11.250 & 0.5625 Ha. In Forest Division/ Social Forestry Division Hamirpur, District-Hamirpur (UP)
StatusLapsed
Status since5 Sept 2025
Application filed27 Jul 2025
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantIndraprastha Gas Limited New Delhi
Land area1.4 acres (0.6 ha)
Forest land1.4 acres (0.6 ha)
Project cost₹86 lakh
Village / localityBharuwa Sumerpur
Taluk / tehsilHamirpur
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05148

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Change of use filed 28 Nov 2025More information requested1.4 acres₹86 lakh
New project filed 27 Jul 2025 (this page)Lapsed1.4 acres₹86 lakh

In context

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bharuwa Sumerpur, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indraprastha Gas Limited New Delhi in Hamirpur

10 Indraprastha Gas Limited projects in Hamirpur
All 35 Indraprastha Gas Limited projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.