Quick answers
What is Project for Laying of Carbon Steel Gas Pipe Line (300mm)?
Project for Laying of Carbon Steel Gas Pipe Line (300mm) is a lapsed pipeline project in Narayanpur, Hamirpur, Uttar Pradesh. The site covers 1.6 acres.
Who is building it?
The applicant is Indraprastha Gas Limited New Delhi.
Has it been approved?
No. The application was lapsed on 1 Sept 2025, so it is no longer under consideration.
Where is it?
In Narayanpur, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹86 lakh; a site of 1.6 acres and 1.6 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 27 Jul 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Project for Laying of Carbon Steel Gas Pipe Line (300mm)
Project details
| Official title | Project for Laying of Carbon Steel Gas Pipe Line (300mm) along with road on Kanpur -Sagar Marg NH-86 (New NH-34) at From Km. 67.100 to Km. 80.000 (RHS), Total Km. 12.900 & 0.6450 Ha. In Forest Division/ Social Forestry Division Hamirpur, District-Hamirpur (UP) |
|---|---|
| Status | Lapsed |
| Status since | 1 Sept 2025 |
| Application filed | 27 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Indraprastha Gas Limited New Delhi |
| Land area | 1.6 acres (0.7 ha) |
| Forest land | 1.6 acres (0.6 ha) |
| Project cost | ₹86 lakh |
| Village / locality | Narayanpur |
| Taluk / tehsil | Hamirpur |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06434 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 28 Nov 2025 | More information requested | 1.6 acres | ₹86 lakh |
| New project filed 27 Jul 2025 (this page) | Lapsed | 1.6 acres | ₹86 lakh |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Narayanpur, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — more information requested, 0 m away
- Proposed Hindustan Petroleum Corporation Ltd. retail outlet On Kanpur-Kabrai… — in-principle approval, conditions pending, 1.3 km away
- "Development of Economic Corridors, Inter Corridors and Feeder Routes to… — under environmental review, 3.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — more information requested, 3.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — more information requested, 7 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — more information requested, 7.2 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 7.3 km away
- Proposed forest land to be diverted for Construction of CC Road — more information requested, 7.3 km away
More from Indraprastha Gas Limited New Delhi in Hamirpur
- Diversion of 0.2498 Hectare of protected Forest land under Social forestry… — under forest review
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — more information requested
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — more information requested
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed
10 Indraprastha Gas Limited projects in Hamirpur
All 35 Indraprastha Gas Limited projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.