What is Developing? Open the mapMap

Under forest reviewFuel stations · Balrampur, Uttar Pradesh

Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet

Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet is a proposed fuel station in Balwa Balui, Balrampur, Uttar Pradesh. The site covers 0.8 acres. Its stated project cost is ₹55 lakh. As of 27 Nov 2026, its status is “Under forest review” (since 28 Oct 2026).

See it on the live map All projects in Balrampur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet is a proposed fuel station in Balwa Balui, Balrampur, Uttar Pradesh. The site covers 0.8 acres.

Who is building it?

The applicant is Indian Oil Corporation Limited (IOCL).

Has it been approved?

Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.

Where is it?

In Balwa Balui, Balrampur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹55 lakh; a site of 0.8 acres and 1,930 m² of forest land.

When was it filed?

The application was filed on 14 Oct 2026.

Project details

Official titleProposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet at Village:- Baluwa Balui, Tehsil:-Balrampur, District:- Balrampur (Uttar Pradesh).
StatusUnder forest review
Status since28 Oct 2026
Application filed14 Oct 2026
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantIndian Oil Corporation Limited (IOCL)
Land area3,200 m²
Forest land1,930 m²
Project cost₹55 lakh
Village / localityBalwa Balui
Taluk / tehsilBalrampur
DistrictBalrampur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05226

In context

16 applications in Balrampur since January 2022 are in the same category (Fuel stations): 13 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0.8 acres, this one is smaller than 56% of them.

Where it is

Balwa Balui, Balrampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indian Oil Corporation Limited (IOCL) in Balrampur

10 Indian Oil Corporation (IOCL) projects in Balrampur
All 822 Indian Oil Corporation (IOCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.