Project details
| Official title | Proposal for Diversion of Pf Land in Favour of M/S Hindustan Petroleum Corporation LTD. Meerut for Approach Access of Proposed Retail Outlet on NH-58 (New NH-334) at Km. Chainage 132.469 (Lhs), Khasra N0 28/1 in Village Badhedi Tehsil & District Muzaffranagar. |
|---|---|
| Status | Forest land use approved |
| Status since | 14 Oct 2025 |
| Application filed | 4 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Balram Goel |
| Land area | 1.6 acres (0.6 ha) |
| Forest land | 1.1 acres (0.4 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Badheri |
| Taluk / tehsil | Muzaffarnagar |
| District | Muzaffarnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05234 |
In context
15 applications in Muzaffarnagar since January 2022 are in the same category (Fuel stations): 8 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 1.6 acres, this one is larger than 93% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Badheri, Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.3214 Ha PF LAND in favor of M/S Indian Oil Corporation Limited,… — in-principle approval, conditions pending, 750 m away
- Diversion of Pf Land in Favour of M/S Indraprastha Gas Limited (Igl). New… — forest land use approved, 1.7 km away
- Diversion of 0.9368 Ha PF LAND in favour of M/S Indarprastha Gas Ltd. New… — forest land use approved, 2.2 km away
- G S Medical College & Hospital, Muzaffarnagar — under environmental review, 3.8 km away
- "Ordinary Soil Excavation Project" at Gata No.¬ 1176, 1177, 1178, 1179, 1181,… — lapsed, 4.6 km away
- Modification in Induction Furnace from 15 Ton to 20 Ton for Existing… — under environmental review, 7.4 km away
- Modification in Induction Furnace from 15 ton to 20 ton for Existing… — returned to applicant, 7.4 km away
- Laying of Electrical Cable 33 kv U G XLPE cables M/s Silverton Pulp and Papers… — forest land use approved, 8.1 km away
More from Balram Goel in Muzaffarnagar
- Diversion of Pf Land in Favour of M/S Hindustan Petroleum Corporation Limited,… — under forest review
- Diversion of 0.1660 Ha PF Land in favour of M/S Hindustan Petroleum… — forest land use approved
- NOC Wildlife Clearance of Construction of Retail Oultlet Proposed by M/S… — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.