Project details
| Official title | Proposal for NOC Wildlife Clearance of Construction of Retail Oultlet Proposed by M/S Hindustan Petroleum Corporation Limited Meerut, site situated along Meerut - Najibabad Road (New NH 34) in exiting stone No. 53, chainage 52.527 (LHS) (increasing chainage Towards Najibabad) at Khasra No. 293 & 288, Village - Mubarikpur, Tehsil Janshath, District Muzaffarnagar (U.P.) Falling within the Eco Sensitive Zone Boundary of Hastinapur wildlife Sanctuary. |
|---|---|
| Status | Under wildlife review |
| Status since | 9 Aug 2024 |
| Application filed | 9 Aug 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Balram Goel |
| Land area | 1.1 acres (0.5 ha) |
| Project cost | ₹55 lakh |
| Village / locality | Mubarik Pur |
| Taluk / tehsil | Jansath |
| District | Muzaffarnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07332 |
In context
26 applications in Muzaffarnagar since January 2022 are in the same category (Buildings & townships): 9 approved, 16 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 1.1 acres, this one is smaller than 58% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mubarik Pur, Jansath, Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposal of 0.1922 Ha Protected Forest Land to Be Diverted for Entry and Exit… — under wildlife review, 2.8 km away
- Proposal of 0.1922 Ha Protected Forest Land to Be Diverted for Entry and Exit… — lapsed, 2.9 km away
- Proposal Of0.1922 Ha Proctected Forest Land to Be Diverted for Entry and Exit… — more information requested, 2.9 km away
- Proposal Of0.1922 Ha Proctected Forest Land to Be Diverted for Entry and Exit… — lapsed, 2.9 km away
- No Increase in Pollution Load Certificate" for Proposed Expansion of Existing… — initial checks, 2.9 km away
- Forest Land Proposed to be diverted for 132KV Transmission line from Jansath… — under wildlife review, 3 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — under wildlife review, 6 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — lapsed, 6 km away
More from Balram Goel in Muzaffarnagar
- Diversion of Pf Land in Favour of M/S Hindustan Petroleum Corporation Limited,… — under forest review
- Diversion of 0.1660 Ha PF Land in favour of M/S Hindustan Petroleum… — forest land use approved
- Diversion of Pf Land in Favour of M/S Hindustan Petroleum Corporation LTD.… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.