Quick answers
What is this project?
Protected Forest Land proposed for diversion for Entry/Exit approach to Hindustan Petroleum Corporation Limited Retail Outlet on Fatehpur-Baberu-Atarra-Naraini-Kartal Marg (SH-71), In KM Stone No.4 Ch.3.445-3.471 (RHS), At Gata No.770,771 Village: Malaka , Tehsil: Sadar, District: Fatehpur (Uttar Pradesh) is an approved fuel station in Malaka, Fatehpur, Uttar Pradesh. The site covers 0.8 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 30 Jul 2025), as of 27 Nov 2026.
Where is it?
In Malaka, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹45 lakh; a site of 0.8 acres and 480 m² of forest land.
When was it filed?
The application was filed on 7 Dec 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 30 Jul 2025 |
| Application filed | 7 Dec 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 3,400 m² |
| Forest land | 480 m² |
| Project cost | ₹45 lakh |
| Village / locality | Malaka |
| Taluk / tehsil | Fatehpur |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05251 |
In context
50 applications in Fatehpur since January 2022 are in the same category (Fuel stations): 38 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.8 acres, this one is larger than 52% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Malaka, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 700 m away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved, 1 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — forest land use approved, 5.4 km away
- Laying of CS Gas Pipe Line (200mm) — forest land use approved, 7.5 km away
- Project for Laying of Carbon Steel Gas Pipe Line (200mm) — lapsed, 7.5 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 7.9 km away
- Re-diversion for Reliance 4G Project for Laying of OFC — lapsed, 8 km away
- Re-diversion for Reliance4G Project for Laying of OFC alongwith… — forest land use approved, 8 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Fatehpur
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — in-principle approval, conditions pending
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — forest land use approved
10 Hindustan Petroleum Corporation (HPCL) projects in Fatehpur
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.