What is Developing? Open the mapMap

Forest land use approvedFuel stations · Fatehpur, Uttar Pradesh

Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP Mobility Limited Retail Outlet

Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP Mobility Limited Retail Outlet is an approved fuel station in Churiyani, Fatehpur, Uttar Pradesh. The site covers 1.4 acres. Its stated project cost is ₹65 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 7 Apr 2026).

See it on the live map All projects in Fatehpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP Mobility Limited Retail Outlet is an approved fuel station in Churiyani, Fatehpur, Uttar Pradesh. The site covers 1.4 acres.

Who is building it?

The applicant is Reliance Bp Mobility Limited.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 7 Apr 2026), as of 27 Nov 2026.

Where is it?

In Churiyani, Fatehpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹65 lakh; a site of 1.4 acres and 960 m² of forest land.

When was it filed?

The application was filed on 15 Mar 2026.

Project details

Official titleProposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP Mobility Limited Retail Outlet at Village:-Churiyani, Tehsil:-Sadar, District:- Fatehpur (Uttar Pradesh).
StatusForest land use approved
Status since7 Apr 2026
Application filed15 Mar 2026
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantReliance Bp Mobility Limited
Land area1.4 acres (0.6 ha)
Forest land960 m²
Project cost₹65 lakh
Village / localityChuriyani
Taluk / tehsilFatehpur
DistrictFatehpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05730

In context

50 applications in Fatehpur since January 2022 are in the same category (Fuel stations): 38 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 1.4 acres, this one is larger than 86% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Churiyani, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Reliance Bp Mobility Limited in Fatehpur

6 Reliance Bp Mobility projects in Fatehpur
All 153 Reliance Bp Mobility projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.