Quick answers
What is this project?
Proposed Forest Land to be diverted for Work of Tourism Infrastructure Facilities is a proposed tourism project in Akorhi, Mirzapur, Uttar Pradesh. The site covers 0.7 acres.
Who is building it?
The applicant is Uttar Pradesh Tourism Department Mirzapur.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Akorhi, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹5 crore; a site of 0.7 acres and 2,770 m² of forest land.
When was it filed?
The application was filed on 5 May 2026.
Project details
| Official title | Proposed Forest Land to be diverted for Work of Tourism Infrastructure Facilities, in District: Mirzapur (Uttar Pradesh). |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 16 Nov 2026 |
| Application filed | 5 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Tourism & hotels |
| Applicant | Uttar Pradesh Tourism Department Mirzapur |
| Land area | 2,800 m² |
| Forest land | 2,770 m² |
| Project cost | ₹5 crore |
| Village / locality | Akorhi |
| Taluk / tehsil | Mirzapur |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05259 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Akorhi, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be diverted for Beautification Work of Temple — more information requested, 1.4 km away
- Proposed Reserved Forest to be diverted for construction of 4 lane Mirzapur… — forest land use approved, 3.8 km away
- Proposed Forest Land to be diverted for New Construction of Link Road — lapsed, 8.6 km away
- Proposed "Sand Stone Quartzite Ballast Gitti" Project at Gata No.- 2571 to… — environmental approval granted, 9 km away
- Building Stone (Sandstone) at Gata No.- 36/1, Village- Sonbarsa, Tehsil-… — environmental approval granted, 10.5 km away
- Building Stone (Sandstone) at Gata No.- 36/1, Village- Sonbarsa, Tehsil-… — withdrawn, 10.5 km away
- Building Stone (Sandstone) at Gata No.- 36/1, Village- Sonbarsa, Tehsil-… — cleared for impact study, 10.5 km away
- "Sand Stone (Quartzite Bailast Gitti)" Project at Gata No.- 36/6/5, Village-… — environmental approval granted, 10.5 km away