Quick answers
What is this project?
Proposed Reserved Forest to be diverted for construction of 4 lane Mirzapur Bypass Major Bridge over Ganga River in forest Division Mirzapur Uttar Pradesh is an approved road project in Duhauwa, Mirzapur, Uttar Pradesh. The site covers 239.5 acres.
Who is building it?
The applicant is Ministry of Road Transport & Highways.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 10 Sept 2026), as of 27 Nov 2026.
Where is it?
In Duhauwa, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1,708.6 crore; a site of 239.5 acres and 10.7 acres (4.3 ha) of forest land.
When was it filed?
The application was filed on 29 Jun 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 10 Sept 2026 |
| Application filed | 29 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ministry of Road Transport & Highways |
| Land area | 239.5 acres (96.9 ha) |
| Forest land | 10.7 acres (4.3 ha) |
| Project cost | ₹1,708.6 crore |
| Village / locality | Duhauwa |
| Taluk / tehsil | Mirzapur |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05870 |
In context
7 applications in Mirzapur since January 2022 are in the same category (Roads & highways): 1 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Duhauwa, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be diverted for Beautification Work of Temple — more information requested, 2.5 km away
- Proposed Forest Land to be diverted for Work of Tourism Infrastructure… — in-principle approval, conditions pending, 3.8 km away
- Proposed Forest Land to be diverted for New Construction of Link Road — lapsed, 8.2 km away
- Proposed project of Ordinary Sand Mining project at Gata No.- 592/1, Area- 5.0… — environmental approval granted, 9 km away
- Proposed "Sand Stone Quartzite Ballast Gitti" Project at Gata No.- 2571 to… — environmental approval granted, 9.8 km away
- "Ordinary Sand Mining" Project at Gata No.- 494 Ga/1, Village- Baisukiya,… — environmental approval granted, 10.3 km away
- "Ordinary Sand Mining" Project at Gata No.- 494 Ga/1, Village- Baisukiya,… — cleared for impact study, 10.3 km away
- Proposed Cement Grinding Unit having 300 TPD (99000 TPA) production capacity… — under environmental review, 11.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.