What is 400 kV D/c Quad Bareilly - Bareilly Line?
400 kV D/c Quad Bareilly - Bareilly Line is an approved power project in Ata Patti Janubi, Bareilly, Uttar Pradesh. The site covers 87.6 acres.
Who is building it?
The applicant is Power Grid Corporation of India (POWERGRID).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 28 Oct 2026), as of 27 Nov 2026.
Where is it?
In Ata Patti Janubi, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹212.8 crore; a site of 87.6 acres and 670 m² of forest land.
When was it filed?
The application was filed on 6 Feb 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 28 Oct 2026 |
| Application filed | 6 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Power Grid Corporation of India (POWERGRID) |
| Land area | 87.6 acres (35.5 ha) |
| Forest land | 670 m² |
| Project cost | ₹212.8 crore |
| Village / locality | Ata Patti Janubi |
| Taluk / tehsil | Bareilly |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05287 |
In context
9 applications in Bareilly since January 2022 are in the same category (Power): 1 approved, 0 filed or under review, and 8 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ata Patti Janubi, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land Proposed to be Diverdet fo Entry/Exit Approach road… — forest land use approved, 3.4 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 4.1 km away
- Protected Forest Land Land Proposed To be diverted for Entry/Exit Approach… — forest land use approved, 10.1 km away
- Nirbhua Soil Mining Project — initial checks, 10.9 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 11 km away
- Re-Diversion of Forest Land for Laying of Reliance Jio Optical Fibre Cable — more information requested, 11.2 km away
- Re-Diversion of Forest Land for Laying of Reliance Jio Optical Fibre Cable — lapsed, 11.5 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed, 11.8 km away
All 45 Power Grid Corporation of India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.