What is Developing? Open the mapMap

More information requestedPipelines · Bareilly, Uttar Pradesh

Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line along Bareilly Bypass- Hasanpur Village SH-37 Road (Ch. 0.000 to 3.300) Left, (Ch. 3.300 to 3.918) Right , (Ch. 3.918 to 4.618) Left, (Ch. 4.618 to 20.362) Right and (Ch. 20.362 to 32.000) Left Side by HPCL

Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line along Bareilly Bypass- Hasanpur Village SH-37 Road (Ch. 0.000 to 3.300) Left, (Ch. 3.300 to 3.918) Right , (Ch. 3.918 to 4.618) Left, (Ch. 4.618 to 20.362) Right and (Ch. 20.362 to 32.000) Left Side by HPCL is a proposed pipeline project in Bichpuri, Baheri, Bareilly, Uttar Pradesh. The site covers 4.3 acres. Its stated project cost is ₹80 lakh. As of 27 Nov 2026, its status is “More information requested” (since 9 Mar 2026).

See it on the live map All projects in Bareilly

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line along Bareilly Bypass- Hasanpur Village SH-37 Road (Ch. 0.000 to 3.300) Left, (Ch. 3.300 to 3.918) Right , (Ch. 3.918 to 4.618) Left, (Ch. 4.618 to 20.362) Right and (Ch. 20.362 to 32.000) Left Side by HPCL is a proposed pipeline project in Bichpuri, Baheri, Bareilly, Uttar Pradesh. The site covers 4.3 acres.

Who is building it?

The applicant is Hindustan Petroleum Corporation Limited (HPCL).

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Bichpuri, Baheri, Bareilly, Uttar Pradesh.

How big is it?

It has a stated cost of ₹80 lakh; a site of 4.3 acres and 4.3 acres (1.8 ha) of forest land.

When was it filed?

The application was filed on 22 Aug 2023.

Project details

Official titleProposed Protected Forest Land to be diverted for Laying of Gas Pipe Line along Bareilly Bypass- Hasanpur Village SH-37 Road (Ch. 0.000 to 3.300) Left, (Ch. 3.300 to 3.918) Right , (Ch. 3.918 to 4.618) Left, (Ch. 4.618 to 20.362) Right and (Ch. 20.362 to 32.000) Left Side in District-Bareilly, Uttar Pradesh.
StatusMore information requested
Status since9 Mar 2026
Application filed22 Aug 2023
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantHindustan Petroleum Corporation Limited (HPCL)
Land area4.3 acres (1.8 ha)
Forest land4.3 acres (1.8 ha)
Project cost₹80 lakh
Village / localityBichpuri
Taluk / tehsilBaheri
DistrictBareilly
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05955

In context

9 applications in Bareilly since January 2022 are in the same category (Pipelines): 1 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bichpuri, Baheri, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Hindustan Petroleum Corporation Limited (HPCL) in Bareilly

10 Hindustan Petroleum Corporation (HPCL) projects in Bareilly
All 508 Hindustan Petroleum Corporation (HPCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.