Quick answers
What is this project?
The Project Envisages the Use of Protected Forest Land for the Construction of Service Road Parallel to Proposed New Bridge Constructed by U.P. State Bridge Corporation LTD. Muradabad (Under Fca 1980) for the Diversion of 0.3822 Hectare of Protected Forest Land for Non-Forestry Purpose is an approved road project in Maulagarh, Chandausi, Sambhal, Uttar Pradesh. The site covers 1.6 acres.
Who is building it?
The applicant is Up State Bridge Corporation Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 12 Apr 2025), as of 27 Nov 2026.
Where is it?
In Maulagarh, Chandausi, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹56.5 crore; a site of 1.6 acres and 3,820 m² of forest land.
When was it filed?
The application was filed on 24 Jun 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 12 Apr 2025 |
| Application filed | 24 Jun 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Up State Bridge Corporation Limited |
| Land area | 1.6 acres (0.7 ha) |
| Forest land | 3,820 m² |
| Project cost | ₹56.5 crore |
| Village / locality | Maulagarh |
| Taluk / tehsil | Chandausi |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05398 |
In context
6 applications in Sambhal since January 2022 are in the same category (Roads & highways): 2 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Maulagarh, Chandausi, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed protected forest land to be diverted for Block spot by Construction… — lapsed, 1.8 km away
- Proposed protected forest land to be diverted for Block spot by Construction… — forest land use approved, 1.8 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — forest land use approved, 4.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 4.7 km away
- Proposed "Ordinary Soil Mining Project" at Gata 3573, 3572, 3571, 3201, 3224,… — environmental approval granted, 5.2 km away
- "Ordinary Earth Mining" Project at Gata No.- 168, 172, 176, Village-… — environmental approval granted, 5.8 km away
- "Ordinary Soil Mining" Project at Gata No.- 133मि, 185, 187. 252, 306 Village-… — environmental approval granted, 5.8 km away
- Proposed Ordinary Earth excavation from Khasra/Gata Proposed Ordinary Earth… — environmental approval granted, 6.4 km away
All 17 Up State Bridge Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.