What is Developing? Open the mapMap

More information requestedFuel stations · Jhansi, Uttar Pradesh

Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet

Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet is a proposed fuel station in Hansari Gird, Jhansi, Uttar Pradesh. The site covers 0.8 acres. Its stated project cost is ₹55 lakh. As of 27 Nov 2026, its status is “More information requested” (since 24 Apr 2026).

See it on the live map All projects in Jhansi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet is a proposed fuel station in Hansari Gird, Jhansi, Uttar Pradesh. The site covers 0.8 acres.

Who is building it?

The applicant is Hindustan Petroleum Corporation Limited (HPCL).

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Hansari Gird, Jhansi, Uttar Pradesh.

How big is it?

It has a stated cost of ₹55 lakh; a site of 0.8 acres and 1,770 m² of forest land.

When was it filed?

The application was filed on 27 Jun 2025.

Project details

Official titleProposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet at Village:- Hansari Gird, Tehsil:- Jhansi, District:- Jhansi.
StatusMore information requested
Status since24 Apr 2026
Application filed27 Jun 2025
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantHindustan Petroleum Corporation Limited (HPCL)
Land area3,300 m²
Forest land1,770 m²
Project cost₹55 lakh
Village / localityHansari Gird
Taluk / tehsilJhansi
DistrictJhansi
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05404

In context

31 applications in Jhansi since January 2022 are in the same category (Fuel stations): 13 approved, 5 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 0.8 acres, this one is smaller than 77% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Hansari Gird, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Hindustan Petroleum Corporation Limited (HPCL) in Jhansi

4 Hindustan Petroleum Corporation (HPCL) projects in Jhansi
All 508 Hindustan Petroleum Corporation (HPCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.