Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail Outlet is a proposed fuel station in Bijauli, Jhansi, Uttar Pradesh. The site covers 0.6 acres.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Bijauli, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 0.6 acres and 690 m² of forest land.
When was it filed?
The application was filed on 26 Oct 2025.
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail Outlet at Village: - Bijauli, Tehsil: -Jhansi, District: - Jhansi. |
|---|---|
| Status | More information requested |
| Status since | 11 Nov 2025 |
| Application filed | 26 Oct 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 2,300 m² |
| Forest land | 690 m² |
| Project cost | ₹60 lakh |
| Village / locality | Bijauli |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05872 |
In context
31 applications in Jhansi since January 2022 are in the same category (Fuel stations): 13 approved, 5 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 0.6 acres, this one is smaller than 97% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bijauli, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — more information requested, 2.5 km away
- Proposed Forest Land to be diverted for Construction of Road — lapsed, 3 km away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — more information requested, 3.8 km away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — cleared for impact study, 3.8 km away
- Building Stone "Khanda-Boulder /Gitti-Ballast Mining Project — environmental approval granted, 3.9 km away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — under environmental review, 3.9 km away
- "Building Stone (Khanda, Gitty, Boulder) Mining Project" located at Gata No.… — lapsed, 3.9 km away
- Building Stone Boulder-Khanda / Gitti-Ballast Mining Project At Gata No. 310… — environmental approval granted, 4 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Jhansi
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — more information requested
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved
- Proposed Protected Forest Land to be diverted for Entry/Exit of approach to… — forest land use approved
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved
8 Bharat Petroleum Corporation (BPCL) projects in Jhansi
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.