Project details
| Official title | Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy Limited Retail Outlet at Village: - Barsohiya, Tehsil:- Maholi, District:- Sitapur (Uttar Pradesh). |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 24 Sept 2026 |
| Application filed | 10 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | M/S Nayara Energy Limited |
| Land area | 1 acres (0.4 ha) |
| Forest land | 2,330 m² |
| Project cost | ₹60 lakh |
| Village / locality | Barsuhia |
| Taluk / tehsil | Misrikh |
| District | Sitapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05410 |
In context
31 applications in Sitapur since January 2022 are in the same category (Fuel stations): 24 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 1 acre, this one is larger than 71% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barsuhia, Misrikh, Sitapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of 12" Carbon steel Gas Pipeline along the road by BPCL on… — lapsed, 2.1 km away
- Proposed Protected Forest Land to Be Diverted for Entry/Exit Approach to Iocl… — forest land use approved, 13.8 km away
- No Increase in Pollution Load Certificate for Proposing to Utilize Cane Juice… — initial checks, 14.2 km away
- Expansion of Grain based Ethanol Plant from 200 KLPD to 500 KLPD — environmental approval granted, 14.2 km away
- Ramraj Soil Mining Project — environmental approval granted, 16.7 km away
- "Ordinary Soil Excavation Project" — environmental approval granted, 16.8 km away
- Proposed "Ordinary Soil Mining Project" at Gata No. 282, 268, 348, 267, 269,… — initial checks, 17.1 km away
- Kapurpur Soil Mining Project — under environmental review, 17.4 km away
All 61 Nayara Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.