Quick answers
What is this project?
Diversion of 0.5070 Ha. Protected Forest Land for Shifting of Proposed Toll Plaza from Ch. 198+100 to Ch. 225+250, in Distt- SantKabir Nagar of the project Ayodhya-Gorakhpur section from Km 200.000 to Km 252.860 of NH-28 under ToT Mode is a proposed road project in Churee, Khalilabad, Sant Kabir Nagar, Uttar Pradesh. The site covers 1.3 acres.
Who is building it?
The applicant is National Highway Authority of India.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Churee, Khalilabad, Sant Kabir Nagar, Uttar Pradesh.
How big is it?
It has a stated cost of ₹5 crore; a site of 1.3 acres and 1.3 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 6 Oct 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 5 Nov 2026 |
| Application filed | 6 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | National Highway Authority of India |
| Land area | 1.3 acres (0.5 ha) |
| Forest land | 1.3 acres (0.5 ha) |
| Project cost | ₹5 crore |
| Village / locality | Churee |
| Taluk / tehsil | Khalilabad |
| District | Sant Kabir Nagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05446 |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Churee, Khalilabad, Sant Kabir Nagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 1.6 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipeline — more information requested, 3.5 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipeline — lapsed, 3.5 km away
- Protected Forest Land to be Diverted for Entry/Exit approach to Reliance BP… — forest land use approved, 5.7 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — lapsed, 6.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 10.1 km away
- Proposed 650 Bedded Hospital of AAMAN PUBLIC CHARITABLE TRUST — more information requested, 10.5 km away
- Westin Resort and Spa — initial checks, 10.6 km away
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.