Quick answers
What is this project?
Proposed protected forest land to be diverted for Entry/Exit approach to Torrent Gas Private Limited, CNG Station on Basti to Khalilabad Road NH-27 (Old NH-28) in Km No. 220 (CH. No.- 219.050, LHS) at Khasra No. 303A and 303B, Village:- Buddhakala, Tehsil:-Khalilabad, District:-Santkabir Nagar is a lapsed building project in Budha Kalan, Khalilabad, Sant Kabir Nagar, Uttar Pradesh. The site covers 1.6 acres.
Who is building it?
The applicant is Torrent Gas Private Limited.
Has it been approved?
No. The application was lapsed on 19 Apr 2025, so it is no longer under consideration.
Where is it?
In Budha Kalan, Khalilabad, Sant Kabir Nagar, Uttar Pradesh.
How big is it?
It has a stated cost of ₹80 lakh; a site of 1.6 acres and 1,920 m² of forest land.
When was it filed?
The application was filed on 30 Dec 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 19 Apr 2025 |
| Application filed | 30 Dec 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Torrent Gas Private Limited |
| Land area | 1.6 acres (0.6 ha) |
| Forest land | 1,920 m² |
| Project cost | ₹80 lakh |
| Village / locality | Budha Kalan |
| Taluk / tehsil | Khalilabad |
| District | Sant Kabir Nagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07169 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Budha Kalan, Khalilabad, Sant Kabir Nagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 650 Bedded Hospital of AAMAN PUBLIC CHARITABLE TRUST — more information requested, 4.4 km away
- Westin Resort and Spa — initial checks, 4.5 km away
- Diversion of 0.5070 Ha. Protected Forest Land for Shifting of Proposed Toll… — under forest review, 6.1 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 7.7 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipeline — more information requested, 9.6 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipeline — lapsed, 9.6 km away
- Protected Forest Land to be Diverted for Entry/Exit approach to Reliance BP… — forest land use approved, 11.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 14.6 km away
More from Torrent Gas Private Limited in Sant Kabir Nagar
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipeline — more information requested
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipeline — lapsed
3 Torrent Gas projects in Sant Kabir Nagar
All 30 Torrent Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.