Project details
| Official title | Proposed Forest Land to be diverted for Widening and Strengthening of Road in District: Gorakhpur. |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 8 Sept 2026 |
| Application filed | 9 Feb 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Construction Divison 3 Pwd Gorakhpur |
| Land area | 50.7 acres (20.5 ha) |
| Forest land | 40.1 acres (16.2 ha) |
| Project cost | ₹838.1 crore |
| Village / locality | Balapar |
| Taluk / tehsil | Gorakhpur |
| District | Gorakhpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05494 |
In context
9 applications in Gorakhpur since January 2022 are in the same category (Roads & highways): 3 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected.
Where it is
Balapar, Gorakhpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential and Non-Residential buildings of 2nd Battalion Special Security… — environmental approval granted, 5.3 km away
- City Gas Distribution network in Lakhimpur, Sitapur, Baihraich, Shrawasti,… — lapsed, 7.2 km away
- Proposed Shree Gorakshnath Medical College Hospital & Research Centre, Arogya… — environmental approval granted, 7.7 km away
- Proposed Shree Gorakshnath Medical College Hospital & Research Centre, Arogya… — cleared for impact study, 7.7 km away
- New Rohini MIG Group Housing Flats — environmental approval granted, 9.3 km away
- Raptinagar Extension Township & Sports-City,gorakhpur,u.P — environmental approval granted, 9.5 km away
- Raptinagar Extension Township & Sports-City,gorakhpur,u.P — cleared for impact study, 9.5 km away
- Commercial Cum Residential Building Project by Vikas Kejriwal — environmental approval granted, 12.1 km away
More from Executive Engineer Construction Divison 3 Pwd Gorakhpur in Gorakhpur
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — under forest review
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — forest land use approved
- Proposed Forest Land to be diverted for Widening and Strengthening in 04 Lane… — in-principle approval, conditions pending
All 4 Executive Engineer Construction, Uttar Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.