Project details
| Official title | Proposed Forest Land to be diverted for Widening and Strengthening of Road, in District: Gorakhpur. |
|---|---|
| Status | Forest land use approved |
| Status since | 9 Apr 2026 |
| Application filed | 23 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Construction Divison 3 Pwd Gorakhpur |
| Land area | 7.3 acres (2.9 ha) |
| Forest land | 1.2 acres (0.5 ha) |
| Project cost | ₹11.7 crore |
| Village / locality | Chilbilwa |
| Taluk / tehsil | Gorakhpur |
| District | Gorakhpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06484 |
In context
9 applications in Gorakhpur since January 2022 are in the same category (Roads & highways): 3 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chilbilwa, Gorakhpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Development for Expansion of Civil Enclave and other allied services (Apron,… — environmental approval granted, 3.1 km away
- New Civil Enclave at Gorakhpur Airport at Gorakhpur, Uttar Pradesh by AAI — withdrawn, 3.1 km away
- Development for Expansion of Civil Enclave and other allied services (Apron,… — cleared for impact study, 3.2 km away
- 4G Saturation Project — lapsed, 3.4 km away
- Forest Land Proposed for diversion of DVOR at Gorakhpur Airport — forest land use approved, 3.8 km away
- T_26_Gorakhpur_Hata_via_Pipraich — lapsed, 3.9 km away
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — under forest review, 4.7 km away
- 4/6 Lane North-East side Gorakhpur Bypass starting from NH-29E (chainage… — environmental approval granted, 4.8 km away
More from Executive Engineer Construction Divison 3 Pwd Gorakhpur in Gorakhpur
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — under forest review
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — in-principle approval, conditions pending
- Proposed Forest Land to be diverted for Widening and Strengthening in 04 Lane… — in-principle approval, conditions pending
All 4 Executive Engineer Construction, Uttar Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.