Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 11 Sept 2026 |
| Application filed | 23 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 3,400 m² |
| Forest land | 1,770 m² |
| Project cost | ₹65 lakh |
| Village / locality | Lehra Urf Ramnagar |
| Taluk / tehsil | Bansi |
| District | Siddharthnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05500 |
In context
11 applications in Siddharthnagar since January 2022 are in the same category (Fuel stations): 6 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 0.8 acres, this one is smaller than 73% of them.
Where it is
Lehra Urf Ramnagar, Bansi, Siddharthnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed protected forest land to be diverted for Entry/Exit approach to… — lapsed, 5.3 km away
- Proposed IOCL Retail Outlet at Kakrahwa-Basti Road NH-28 (New NH-233),… — under forest review, 8 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 20.1 km away
- Protected Forest Land to be Diverted for Entry/Exit approach to Reliance BP… — under forest review, 23 km away
- Protected Forest Land to be Diverted for Road Widening and Strengthening work… — lapsed, 23.6 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 23.8 km away
- Proposed Protected Forest Land to be re-diverted for Laying of Natural Gas… — more information requested, 26 km away
- Proposed forest land to be diverted for construction of Bridge & Approach Road… — lapsed, 26.3 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Siddharthnagar
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved
4 Bharat Petroleum Corporation (BPCL) projects in Siddharthnagar
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.