Quick answers
What is this project?
Protected Forest Land Proposed for Diversion for Entry/Exit Approach to Nayara Energy Limited Retail Outlet on Bareilly - Sahajhanpur Road NH-30(Old NH- 24) LHS (From Bareilly towards Sahajhanpur ) at Gata no. 695, Village Bakarganj, Tehsil Faridpur, District Bareily (Uttar Pradesh) is an approved fuel station in Bakarganj, Faridpur, Bareilly, Uttar Pradesh. The site covers 1.4 acres.
Who is building it?
The applicant is MD asadullah.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 31 Dec 2025), as of 27 Nov 2026.
Where is it?
In Bakarganj, Faridpur, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 1.4 acres and 2,600 m² of forest land.
When was it filed?
The application was filed on 15 Jan 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 31 Dec 2025 |
| Application filed | 15 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | MD asadullah |
| Land area | 1.4 acres (0.6 ha) |
| Forest land | 2,600 m² |
| Project cost | ₹60 lakh |
| Village / locality | Bakarganj |
| Taluk / tehsil | Faridpur |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05507 |
In context
25 applications in Bareilly since January 2022 are in the same category (Fuel stations): 17 approved, 1 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 1.4 acres, this one is larger than 74% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bakarganj, Faridpur, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Protected Forest Land Proposed For Diversion For Entry/Exit… — more information requested, 400 m away
- Standalone Clinker Grinding Unit with Cement Production Capacity of 3.0… — under environmental review, 2 km away
- Proposed Protected Forest Land to Be Diverted for Entry & Exit Approach to… — forest land use approved, 2.5 km away
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Bharat… — lapsed, 4.1 km away
- HPCL Retail Outlet on NH-30 (Old NH-24) ,In KM Stone No.-284 , Ch.-283.375… — forest land use approved, 4.3 km away
- Protected Forest Land Proposed to be diverted for Entry/Exit Approach Road to… — forest land use approved, 4.6 km away
- Amended Bharatnet Project (Faridpur-Bareilly) — lapsed, 5.3 km away
- Proposed Protected Forest Land to be diverted for Entry/Exit Approach Road to… — under forest review, 5.4 km away