Quick answers
What is this project?
Diversion of Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Vedaan Alimento Street, On NH-30 (Bareilly To Shahjahanpur Road), At KM 279.267 (RHS) In Khasra No. 724, Village: Wakar Ganj, Tehsil: Fareedpur, District: Bareilly, (Uttar Pradesh) is a proposed building project in Bakarganj, Faridpur, Bareilly, Uttar Pradesh. The site covers 9.1 acres.
Who is building it?
The applicant is Golden Infrastructure.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Bakarganj, Faridpur, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹80 lakh; a site of 9.1 acres and 2,830 m² of forest land.
When was it filed?
The application was filed on 6 Dec 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 29 Aug 2026 |
| Application filed | 6 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Golden Infrastructure |
| Land area | 9.1 acres (3.7 ha) |
| Forest land | 2,830 m² |
| Project cost | ₹80 lakh |
| Village / locality | Bakarganj |
| Taluk / tehsil | Faridpur |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05931 |
In context
14 applications in Bareilly since January 2022 are in the same category (Buildings & townships): 8 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 9.1 acres, this one is smaller than 71% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bakarganj, Faridpur, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land Proposed for Diversion for Entry/Exit Approach to Nayara… — forest land use approved, 400 m away
- Proposed Protected Forest Land to Be Diverted for Entry & Exit Approach to… — forest land use approved, 2.2 km away
- Standalone Clinker Grinding Unit with Cement Production Capacity of 3.0… — under environmental review, 2.3 km away
- HPCL Retail Outlet on NH-30 (Old NH-24) ,In KM Stone No.-284 , Ch.-283.375… — forest land use approved, 3.9 km away
- Protected Forest Land Proposed to be diverted for Entry/Exit Approach Road to… — forest land use approved, 4.2 km away
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Bharat… — lapsed, 4.4 km away
- Proposed Protected Forest Land to be diverted for Entry/Exit Approach Road to… — under forest review, 5 km away
- Amended Bharatnet Project (Faridpur-Bareilly) — lapsed, 5.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.