Project details
| Official title | Proposal for Diversion of 0.4310 Ha PF LAND in favor of M/S Indian Oil Corporation Limited, Noida for Approach access of Proposed Retail Outlet on NH-334B (Meerut To Baghpat Road), At KM Chainage 11+040 (RHS), At Khasara No. 737B, 739MI, 737A In Village-Kurali, Tehsil-Meerut, District-Meerut, Uttar Pradesh. |
|---|---|
| Status | Under forest review |
| Status since | 5 Nov 2026 |
| Application filed | 27 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 1.6 acres (0.7 ha) |
| Forest land | 1.1 acres (0.4 ha) |
| Project cost | ₹55 lakh |
| Village / locality | Kurali |
| Taluk / tehsil | Meerut |
| District | Meerut |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05508 |
In context
14 applications in Meerut since January 2022 are in the same category (Fuel stations): 8 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 1.6 acres, this one is larger than 93% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kurali, Meerut, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To… — in-principle approval, conditions pending, 4 km away
- Proposed BPCL Retail Outlet on Meerut-Baghpat Road NH-334B (Old SH-14) in Km.… — forest land use approved, 4.2 km away
- Protected Forest Land Proposed For Transfer For Entry/Exit Approach To… — forest land use approved, 4.6 km away
- Diversion of Forest Land for "Construction of Entry / Exit approach to IOCL… — forest land use approved, 6.9 km away
- Diversion of Forest Land for Approach Road to Private Agricultural Land — lapsed, 7.1 km away
- Diversion of forest land for approach access to Haveli Restaurant at 82 Mile,… — lapsed, 8 km away
- Existing Common Bio-Medical Waste Treatment Facility at Subharti Medical… — environmental approval granted, 10 km away
- Existing Common Bio-Medical Waste Treatment Facility at Subharti Medical… — cleared for impact study, 10 km away
4 Indian Oil Corporation (IOCL) projects in Meerut
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.