Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 16 Oct 2026 |
| Application filed | 13 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indraprastha Gas Limited |
| Land area | 1.1 acres (0.5 ha) |
| Forest land | 1,900 m² |
| Project cost | ₹65 lakh |
| Village / locality | Jani Khurd |
| Taluk / tehsil | Meerut |
| District | Meerut |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05436 |
In context
14 applications in Meerut since January 2022 are in the same category (Fuel stations): 8 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 1.1 acres, this one is larger than 86% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jani Khurd, Meerut, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land Proposed For Transfer For Entry/Exit Approach To… — forest land use approved, 600 m away
- Diversion of 0.4310 Ha PF LAND in favor of M/S Indian Oil Corporation Limited,… — under forest review, 4 km away
- Diversion of Forest Land for "Construction of Entry / Exit approach to IOCL… — forest land use approved, 5.4 km away
- Existing Common Bio-Medical Waste Treatment Facility at Subharti Medical… — environmental approval granted, 6.1 km away
- Existing Common Bio-Medical Waste Treatment Facility at Subharti Medical… — cleared for impact study, 6.1 km away
- Existing Common Bio-Medical Waste Treatment Facility at Subharti Medical… — cleared for impact study, 6.1 km away
- Diversion of forest land for approach access to Haveli Restaurant at 82 Mile,… — lapsed, 6.6 km away
- Proposed BPCL Retail Outlet on Meerut-Baghpat Road NH-334B (Old SH-14) in Km.… — forest land use approved, 8.2 km away
More from Indraprastha Gas Limited in Meerut
- Rediversion of 0.2709 Ha PF LAND in favour of M/S Indarprastha Gas Ltd. New… — more information requested
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed
- Protected Forest Land Proposed For Transfer For Entry/Exit Approach To… — forest land use approved
- Laying of 8" NB Carbon Steel Gas Pipeline along Daurala-Sardhana Road (RHS)… — forest land use approved
- Diversion of 0.4630 Hectare Protected Forest Land for Non-Forestry Use for 8… — forest land use approved
6 Indraprastha Gas projects in Meerut
All 84 Indraprastha Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.