Project details
| Official title | Re-diversion of protected forest land for Permission of Laying and Construction of Dia 4" Steel/125 mm of MDPE Pipeline for Baghpat City Gas Distribution network parallel/along NH 334B from Baghpat Chowk to CNG Station, Tatiri, Baghpat - 3.1 Kms in Tehsil+District Baghpat, Uttar Pradesh. |
|---|---|
| Status | Lapsed |
| Status since | 24 Aug 2026 |
| Application filed | 7 Apr 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Pipelines |
| Applicant | Bagpat Green Energy Private Limited |
| Forest land | 320 m² |
| Project cost | ₹5 crore |
| Village / locality | Tatiri |
| Taluk / tehsil | Baghpat |
| District | Baghpat |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05558 |
In context
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tatiri, Baghpat, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rama Institute of Medical Sciences (Run By Ramaa Eduhealth Research… — lapsed, 2.3 km away
- Baghu Soil Mining Project — environmental approval granted, 3.2 km away
- Proposal of Diversion of 0.0200 Ha. Protected Forest Land for Access… — lapsed, 4 km away
- Diversion of Protected Forest Land for Entry/Exit and Approach Road to… — initial checks, 4 km away
- Gauripur Jawaharnagar Soil Mining Project — environmental approval granted, 4.4 km away
- Diversion For Entry and Exit Approach Road To M/s GOYAL INC "MANUFACTURING… — forest land use approved, 4.5 km away
- Banas Dairy (Amul) — environmental approval granted, 4.9 km away
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To M/S… — forest land use approved, 4.9 km away
More from Bagpat Green Energy Private Limited in Baghpat
- Diversion of Protected Forest Land for Laying of Underground Gas Pipeling on… — under forest review
- Permission for Laying of Underground Natural Gas Pipeline by M/S Baghpat Green… — more information requested
- Proposed Protected Forest Land To Be Diverted For Entry/Exit To M/S Bagpat… — forest land use approved
- Re-diversion of Protected Forest Land for Proposed Laying and Construction of… — forest land use approved
- Laying and Construction Of 6", 4" Dia Steel & 125/90/63/32/20 MDPE MM Pipeline… — forest land use approved
All 6 Bagpat Green Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.