What is Developing? Open the mapMap

LapsedFuel stations · Muzaffarnagar, Uttar Pradesh

Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy Limited Retail Outlet

Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy Limited Retail Outlet is a lapsed fuel station in Kalapur Jasmor, Jansath, Muzaffarnagar, Uttar Pradesh. The site covers 0.8 acres. Its stated project cost is ₹75 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 17 Jan 2025).

See it on the live map All projects in Muzaffarnagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy Limited…

Project details

Official titleProposed forest land to be diverted for Entry/Exit approach to Nayara Energy Limited Retail Outlet at Village: -Kelapur Jasmour, Tehsil:- Jansath, District:- Muzaffar Nagar
StatusLapsed
Status since17 Jan 2025
Application filed12 Aug 2024
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantM/S Nayara Energy Limited
Land area3,400 m²
Forest land1,950 m²
Project cost₹75 lakh
Village / localityKalapur Jasmor
Taluk / tehsilJansath
DistrictMuzaffarnagar
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05560

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 28 Aug 2024Under wildlife review0.8 acres₹75 lakh
New project filed 12 Aug 2024 (this page)Lapsed0.8 acres₹75 lakh

In context

15 applications in Muzaffarnagar since January 2022 are in the same category (Fuel stations): 8 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 0.8 acres, this one is smaller than 73% of them.

8 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kalapur Jasmor, Jansath, Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 61 Nayara Energy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.