One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposal Of0.1922 Ha Proctected Forest Land to Be Diverted for Entry and Exit Approach…
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Jul 2023 |
| Application filed | 12 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 3,500 m² |
| Forest land | 1,920 m² |
| Project cost | ₹55 lakh |
| Village / locality | Rasulpur Garhi |
| Taluk / tehsil | Jansath |
| District | Muzaffarnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05813 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Apr 2023 (this page) | Lapsed | 0.9 acres | ₹55 lakh |
| New project filed 12 Apr 2023 | More information requested | 0.9 acres | ₹55 lakh |
In context
15 applications in Muzaffarnagar since January 2022 are in the same category (Fuel stations): 8 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 0.9 acres, this one is smaller than 67% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rasulpur Garhi, Jansath, Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposal of 0.1922 Ha Protected Forest Land to Be Diverted for Entry and Exit… — lapsed, 0 m away
- Proposal Of0.1922 Ha Proctected Forest Land to Be Diverted for Entry and Exit… — more information requested, 0 m away
- Proposal of 0.1922 Ha Protected Forest Land to Be Diverted for Entry and Exit… — under wildlife review, 50 m away
- Forest Land Proposed to be diverted for 132KV Transmission line from Jansath… — under wildlife review, 1.8 km away
- NOC Wildlife Clearance of Construction of Retail Oultlet Proposed by M/S… — under wildlife review, 2.9 km away
- Ordinary Soil Mining Project — lapsed, 3.5 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — under wildlife review, 3.8 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — lapsed, 3.8 km away
More from Indian Oil Corporation Limited (IOCL) in Muzaffarnagar
- Diversion of 0.3214 Ha PF LAND in favor of M/S Indian Oil Corporation Limited,… — in-principle approval, conditions pending
- DIVERSION OF 0.2232 Ha PF Land in favor of M/S Indian Oil Corporation Ltd.… — forest land use approved
- Proposal of 0.1922 Ha Protected Forest Land to Be Diverted for Entry and Exit… — lapsed
- Proposal of 0.1922 Ha Protected Forest Land to Be Diverted for Entry and Exit… — under wildlife review
- Proposal Of Diversion Of 0.1974 ha.PF Land for Proposed Fuel Station Site Of… — lapsed
7 Indian Oil Corporation (IOCL) projects in Muzaffarnagar
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.