Quick answers
What is this project?
Junction Improvement and Road Marking Work at Rakesh Chemical Junction is a lapsed road project in Dara Rajpura, Saharanpur, Uttar Pradesh. The site covers 0.2 acres.
Who is building it?
The applicant is sAHARANPUR DEVELOPMENT AUTHORITY.
Has it been approved?
No. The application was lapsed on 23 Oct 2024, so it is no longer under consideration.
Where is it?
In Dara Rajpura, Saharanpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹48 lakh; a site of 0.2 acres and 900 m² of forest land.
When was it filed?
The application was filed on 21 Aug 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Oct 2024 |
| Application filed | 21 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | sAHARANPUR DEVELOPMENT AUTHORITY |
| Land area | 900 m² |
| Forest land | 900 m² |
| Project cost | ₹48 lakh |
| Village / locality | Dara Rajpura |
| Taluk / tehsil | Saharanpur |
| District | Saharanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05668 |
In context
11 applications in Saharanpur since January 2022 are in the same category (Roads & highways): 5 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 21 months from filing to approval. At 0.2 acres, this one is smaller than 91% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dara Rajpura, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Construction of RCC drain for storm water… — more information requested, 1.4 km away
- Laying of ø 110 Mm Pvc Pipe Line in Ward 05 From Jamalpur Road Near Indistrial… — lapsed, 1.5 km away
- Re-diversion of forest land for Jio Digital Fibre Private Limited Project for… — lapsed, 5.5 km away
- 33 KV HT line Shifting for underground Laying of 33 Power Line Along… — in-principle approval, conditions pending, 7.5 km away
- Diversion of Forest land for "Construction of Entry/Exist Approach to HPCL… — forest land use approved, 8.1 km away
- Diversion of 0.2490 Ha Forest land for "Construction of Entry/Exist approach… — forest land use approved, 8.4 km away
- "Proposed Construction of Residential & Non- Residential Buildings for 05th… — initial checks, 8.5 km away
- Diversion of Forest Land for " Construction of Entry / Exit approach to IOCL… — forest land use approved, 8.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.