Quick answers
What is this project?
Diversion of Forest Land for " Construction of Entry / Exit approach to IOCL Retail MH/HSD Retail Outlet on Saharanpur - Dehradun Road (NH-344) RHS, Khasra No.- 163, Village- Gagalehri Mustkam, Tehsil & District- Saharanpur (Uttar Pradesh)" is an approved fuel station in Gagalheri, Saharanpur, Uttar Pradesh. The site covers 1.4 acres.
Who is building it?
The applicant is Farman Ali.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 30 May 2025), as of 27 Nov 2026.
Where is it?
In Gagalheri, Saharanpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹50 lakh; a site of 1.4 acres and 1,700 m² of forest land.
When was it filed?
The application was filed on 9 Sept 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 30 May 2025 |
| Application filed | 9 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Farman Ali |
| Land area | 1.4 acres (0.6 ha) |
| Forest land | 1,700 m² |
| Project cost | ₹50 lakh |
| Village / locality | Gagalheri |
| Taluk / tehsil | Saharanpur |
| District | Saharanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06984 |
In context
16 applications in Saharanpur since January 2022 are in the same category (Fuel stations): 12 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 1.4 acres, this one is larger than 94% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gagalheri, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.2490 Ha Forest land for "Construction of Entry/Exist approach… — forest land use approved, 150 m away
- Laying of ø 110 Mm Pvc Pipe Line in Ward 05 From Jamalpur Road Near Indistrial… — lapsed, 7.1 km away
- Diversion of Forest Land for Construction of RCC drain for storm water… — more information requested, 7.1 km away
- Junction Improvement and Road Marking Work at Rakesh Chemical Junction — lapsed, 8.5 km away
- Diversion of Forest Land for "Construction of RCC Drain on both side of NH 72A… — more information requested, 8.6 km away
- Diversion of Forest Land for "Construction of Entry / Exit approach to IOCL… — forest land use approved, 9.5 km away
- 0.2403 Hectare Protected Forest Land Proposed for Diversion For Entry/Exit… — lapsed, 9.6 km away
- Indian Oil Petrol Pump — forest land use approved, 9.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.