What is Developing? Open the mapMap

LapsedFuel stations · Ayodhya, Uttar Pradesh

Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet

Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet is a lapsed fuel station in Ramnagar Dhaurahra, Sohawal, Ayodhya, Uttar Pradesh. The site covers 1.5 acres. Its stated project cost is ₹55 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 26 Sept 2026).

See it on the live map All projects in Ayodhya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet is a lapsed fuel station in Ramnagar Dhaurahra, Sohawal, Ayodhya, Uttar Pradesh. The site covers 1.5 acres.

Who is building it?

The applicant is Indian Oil Corporation Limited (IOCL).

Has it been approved?

No. The application was lapsed on 26 Sept 2026, so it is no longer under consideration.

Where is it?

In Ramnagar Dhaurahra, Sohawal, Ayodhya, Uttar Pradesh.

How big is it?

It has a stated cost of ₹55 lakh; a site of 1.5 acres and 980 m² of forest land.

When was it filed?

The application was filed on 19 Aug 2026.

Project details

Official titleProposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet at Village:-Ramnagar Dhaurahra, Tehsil:-Sohawal, District:- Ayodhya (Uttar Pradesh).
StatusLapsed
Status since26 Sept 2026
Application filed19 Aug 2026
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantIndian Oil Corporation Limited (IOCL)
Land area1.5 acres (0.6 ha)
Forest land980 m²
Project cost₹55 lakh
Village / localityRamnagar Dhaurahra
Taluk / tehsilSohawal
DistrictAyodhya
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05681

In context

15 applications in Ayodhya since January 2022 are in the same category (Fuel stations): 5 approved, 3 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 1.5 acres, this one is larger than 67% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Ramnagar Dhaurahra, Sohawal, Ayodhya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indian Oil Corporation Limited (IOCL) in Ayodhya

4 Indian Oil Corporation (IOCL) projects in Ayodhya
All 822 Indian Oil Corporation (IOCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.