Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet is a lapsed fuel station in Hajipur Barsendi Uphar, Sohawal, Ayodhya, Uttar Pradesh. The site covers 2 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
No. The application was lapsed on 14 May 2026, so it is no longer under consideration.
Where is it?
In Hajipur Barsendi Uphar, Sohawal, Ayodhya, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 2 acres and 1,840 m² of forest land.
When was it filed?
The application was filed on 11 Nov 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet at Village:- Hajipur, Tehsil:- Sohawal, District:- Ayodhya. |
|---|---|
| Status | Lapsed |
| Status since | 14 May 2026 |
| Application filed | 11 Nov 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 2 acres (0.8 ha) |
| Forest land | 1,840 m² |
| Project cost | ₹60 lakh |
| Village / locality | Hajipur Barsendi Uphar |
| Taluk / tehsil | Sohawal |
| District | Ayodhya |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06811 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 May 2025 | Forest land use approved | 1.1 acres | ₹65 lakh |
| New project filed 11 Nov 2024 (this page) | Lapsed | 2 acres | ₹60 lakh |
In context
15 applications in Ayodhya since January 2022 are in the same category (Fuel stations): 5 approved, 3 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 2 acres, this one is larger than 73% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hajipur Barsendi Uphar, Sohawal, Ayodhya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved, 0 m away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 200 m away
- Proposed Protected forest land to be diverted for Entry and Exit of IOCL… — lapsed, 1.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 1.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to BPCL Retail… — lapsed, 1.6 km away
- Proposed forest land to be diverted for Entry/Exit approach to Reliance BP… — forest land use approved, 2.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — in-principle approval, conditions pending, 3.8 km away
- "Ordinary Earth Mine", Village- Shahbazpur, Gata No.- 486, Lease Area- 0.9470… — environmental approval granted, 4.7 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Ayodhya
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved
3 Hindustan Petroleum Corporation (HPCL) projects in Ayodhya
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.