Quick answers
What is Indian Oil Petrol Pump?
Indian Oil Petrol Pump is an approved fuel station in Baheri, Behat, Saharanpur, Uttar Pradesh. The site covers 1 acre.
Who is building it?
The applicant is Vinod.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 15 May 2025), as of 27 Nov 2026.
Where is it?
In Baheri, Behat, Saharanpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1 crore; a site of 1 acre and 2,400 m² of forest land.
When was it filed?
The application was filed on 23 May 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 15 May 2025 |
| Application filed | 23 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Vinod |
| Land area | 4,000 m² |
| Forest land | 2,400 m² |
| Project cost | ₹1 crore |
| Village / locality | Baheri |
| Taluk / tehsil | Behat |
| District | Saharanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05708 |
In context
16 applications in Saharanpur since January 2022 are in the same category (Fuel stations): 12 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 1 acre, this one is larger than 63% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baheri, Behat, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 0.2403 Hectare Protected Forest Land Proposed for Diversion For Entry/Exit… — lapsed, 0 m away
- Diversion of Forest Land for "Construction of Entry / Exit approach to IOCL… — forest land use approved, 250 m away
- Diversion of Forest Land for "Construction of RCC Drain on both side of NH 72A… — more information requested, 1 km away
- Amended Bharatnet Project (Muzaffarabad-Saharanpur) — lapsed, 4.1 km away
- Diversion of Forest Land for " Construction of Entry / Exit approach to IOCL… — forest land use approved, 9.6 km away
- Diversion of 0.2490 Ha Forest land for "Construction of Entry/Exist approach… — forest land use approved, 9.7 km away
- Ofc Laying From Datkali Mata Mandir Km: 32.5(Nh-72a) to Chhutmalpur Km:… — lapsed, 14.6 km away
- Laying of ø 110 Mm Pvc Pipe Line in Ward 05 From Jamalpur Road Near Indistrial… — lapsed, 16.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.