Quick answers
What is this project?
Proposed Forest Land to be Diverted for Widening and Strengthening of road is a lapsed road project in Danti, Mirzapur, Uttar Pradesh. It seeks 33.5 acres of forest land.
Who is building it?
The applicant is Provincial Division Pwd Mirzapur.
Has it been approved?
No. The application was lapsed on 20 Apr 2026, so it is no longer under consideration.
Where is it?
In Danti, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹70.1 crore and 33.5 acres (13.6 ha) of forest land.
When was it filed?
The application was filed on 18 Mar 2026.
Project details
| Official title | Proposed Forest Land to be Diverted for Widening and Strengthening of road, in District: Mirzapur (Uttar Pradesh). |
|---|---|
| Status | Lapsed |
| Status since | 20 Apr 2026 |
| Application filed | 18 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Provincial Division Pwd Mirzapur |
| Forest land | 33.5 acres (13.6 ha) |
| Project cost | ₹70.1 crore |
| Village / locality | Danti |
| Taluk / tehsil | Mirzapur |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05843 |
In context
7 applications in Mirzapur since January 2022 are in the same category (Roads & highways): 1 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Danti, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone Sand Stone" Project at Gata No.- 396Ka, Village- Hadaura,… — environmental approval granted, 3.9 km away
- Request for Name Change of User Agency from Welspun Energy UP Private Limited… — in-principle approval, conditions pending, 4.6 km away
- Proposed forest land to be diverted for Establishment of GAIL Gas Limited… — initial checks, 6.2 km away
- Diversion of forest land for construction of approach road & development of… — lapsed, 6.7 km away
- Expansion of Mirzapur Thermal Power Plant from 1600 (2x800) MW (Phase I) to… — more information requested, 6.8 km away
- Transfer of Environmental Clearance (Change in Name) subsequently to NCLT… — environmental approval granted, 6.8 km away
- 2x800 MW Coal based Ultra Super Critical Thermal Power Project (TPP) — environmental approval granted, 6.8 km away
- 2x800 MW Coal based Ultra Super Critical Thermal Power Project (TPP) — cleared for impact study, 6.8 km away
More from Provincial Division Pwd Mirzapur in Mirzapur
- Proposed Forest Land to be diverted for New Construction of Link Road — lapsed
- Proposed Forest Land to be Diverted for Construction of road — in-principle approval, conditions pending
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.